You are here

Building

Initially the proposed Center for Advanced Manufacture of Materials will be housed in existing laboratories within CEAS

With additional funding from the US Army a state-of-the-art prototype manufacturing center will be established at UWM-USR building on Capitol Drive

Parts of the Center will support the manufacture of biomedical materials; the testing of biomedical materials will be conducted at the proposed new CEAS campus in Wauwatosa

Center of Advanced Materials Manufacturing
115 Reindl Way,
Glendale WI 53212
Link to Google Maps: Click Here

CAD Design

CAD Drawing

Images of Current CAMM Space
asdfasdf